Building Timeline
Generating a quote for an Outdoor Chemical Safety Storage Building can take a few business days or more depending on the complexity of the project to generate the formal quote for the building.
Standard size buildings with no installed options can ship in approximately 15 weeks. Buildings with installed options or custom features can take 20+ weeks from approved drawing to be ready for shipment. Professional Engineer (PE) Stamp or State Design Certification Approval can take multiple weeks.
Standard size buildings with no installed options can ship in approximately 15 weeks. Buildings with installed options or custom features can take 20+ weeks from approved drawing to be ready for shipment. Professional Engineer (PE) Stamp or State Design Certification Approval can take multiple weeks.